RO1-DO1 Tank filling-draining pipes

RO1 and DO1 are a pipe-armatures designed for easy joining of hoses with the TO1 filling-draining disc. They may be joined directly to the TO1 armature or also to RO2, DO2 valves, or also LIS level indicator, that are placed under the TO1 disc, according to current configuration of the tank. The pipes may be equipped with the flap valves.

MTS DO1 004 600x600 300x300 - RO1-DO1 Tank filling-draining pipesMTS DO1F 004 600x600 300x300 - RO1-DO1 Tank filling-draining pipes

RO1 – the product pipe – this armature is intended for filling tank with the beverage product and for draining clear product from the tank. A beverage is sucked above level of yeast in lower part of cone of the tank. We produce the armature in two variants : without the valve and with the flap-valve. The armature is attached to TO1 bottom filling-draining disc or to the RO2 beverage product flap-valve part.

CCTM A2 012 300x300 - RO1-DO1 Tank filling-draining pipesCCTM RO1 B1 300x300 - RO1-DO1 Tank filling-draining pipes

DO1 –the tank draining pipe – this armature is intended for draining full content of the tank and for collecting yeast which is draining from bottom of the tank. The armature is attached to TO1 bottom filling-draining disc or to the DO2 full tank content draibing flap-valve part.

CCTM A2 011 300x300 - RO1-DO1 Tank filling-draining pipesCCTM A3 011 300x300 - RO1-DO1 Tank filling-draining pipes


Offer for the RO1-DO1 tank filling-draining pipes :

 

Other types of the RO1-DO1 tank filling-draining pipes …


Diagram with locations expansion fittings of the modular system CCTM

MTA additional armatures are optional accessories for equipping of the basic tanks. The required configuration of the modular tanks is reached by equipping the basic tank with appropriate combination of additional armatures.

CCT M scheme 03EN 1000x900 - RO1-DO1 Tank filling-draining pipes


General informations about CCTM modular tank system

keyboard_arrow_up