CFS CC2Z Central-cabinet 2-zone

Complete fermentation sets CFS CC2Z : Central-cabinet 2-zone

The CFS CC2Z complete fermentation sets are pre-configured sets that include all what is necessary to fermentation, maturation and storaging of beer, cider, wine or similar alcoholic beverages. They are equipped with several classical cylindrical-conical tanks, one compact liquid cooler and the central cabinet temperature measuring and regulation system with separated digital regulator for each tank cooling zone (two cooling zones in one tank) . All digital temperature regulators are placed in the central cabinet on the wall.

Central cabinet control system + Double cooling zone ( two independent zones) on each tank.

CFS-CC2Z-600x600

Example set CFS CC2Z : CFSCC2-10xCCT1000C Complete beer fermentation set with 10x CCT-1000C, central cabinet control, two-zone cooling

The complete beer fermentation set. This set includes all equipment necessary for professional production of beer using the fermentation and maturation process from wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonated wine.

CBFSCC-2Z-03-Complete-beer-fermentation-sets-central-cabinet

 

Assembling of the set is very easy. The installation does not require any professional workers – there is needed only adequate handling equipment for moving and installation of heavy containers (cylindrical-conical fermenters) on place after delivering of the set. All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore they can be installed by customer using the installation manual. Therefore the price of the set does not include the installation work.

The CFSCC2-10xCCT1000C complete fermentation set includes :

  1. Cylindrical-conical tank Classic CCT-1000/1170 L (insulated 2-jacket) × 10pcs
  2. Compact water chiller-heater 10.7 kW
  3. Tank overflow protection kit for cooler
  4. Central cabinet temperature control system for 20 zones
  5. Main compact manifold set 3/4″ with manometer for connect CWC to 5x 1/2″ branches
  6. Compact manifold set 1/2″ for connect CWC to 2 cooling zones × 5pcs
  7. Plastic Hose for water/glycol 19-24mm × 30meters
  8. Plastic Hose for water/glycol 12-17mm × 70meters
  9. Hose insulation 25-37mm × 30meters
  10. Hose insulation 18-30mm × 70meters
  11. Ball Valve for water/glycol M1/2″-H1/2″ × 40pcs
  12. Hose clamp 20-32mm for hose 3/4″ × 4pcs
  13. Hose clamp 12-22mm for hose 1/2″ × 40pcs
  14. Pipe Fitting Coupler 2xG1/2″F × 30pcs
  15. Assembling manual for easy installation without brewery specialists

 


 

I. Complete fermentation sets with double-cooling-zone CC-tanks 500 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-4xCCT500C Complete set for the fermentation of beer with 4x CCT-500C, central control cabinetCFSCC2-4xCCT500C Complete set for the fermentation of beer with 4x CCT-500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-6xCCT500C Complete set for the fermentation of beer with 6x CCT-500C, central control cabinetCFSCC2-6xCCT500C Complete set for the fermentation of beer with 6x CCT-500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-8xCCT500C Complete set for the fermentation of beer with 8x CCT-500C, central control cabinetCFSCC2-8xCCT500C Complete set for the fermentation of beer with 8x CCT-500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-2xCCT500C Complete set for the fermentation of beer with 2x CCT-500C, central control cabinetCFSCC2-2xCCT500C Complete set for the fermentation of beer with 2x CCT-500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-10xCCT500C Complete set for the fermentation of beer with 10x CCT-500C, central control cabinetCFSCC2-10xCCT500C Complete set for the fermentation of beer with 10x CCT-500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


 

II. Complete fermentation sets with double-cooling-zone CC-tanks 1000 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-10xCCT1000C Complete set for the fermentation of beer with 10x CCT-1000C, central control cabinetCFSCC2-10xCCT1000C Complete set for the fermentation of beer with 10x CCT-1000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-2xCCT1000C Complete set for the fermentation of beer with 2x CCT-1000C, central control cabinetCFSCC2-2xCCT1000C Complete set for the fermentation of beer with 2x CCT-1000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-4xCCT1000C Complete set for the fermentation of beer with 4x CCT-1000C, central control cabinetCFSCC2-4xCCT1000C Complete set for the fermentation of beer with 4x CCT-1000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-8xCCT1000C Complete set for the fermentation of beer with 8x CCT-1000C, central control cabinetCFSCC2-8xCCT1000C Complete set for the fermentation of beer with 8x CCT-1000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


 

III. Complete fermentation sets with double-cooling-zone CC-tanks 1500 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-6xCCT1500C Complete set for the fermentation of beer with 6x CCT-1500C, central control cabinetCFSCC2-6xCCT1500C Complete set for the fermentation of beer with 6x CCT-1500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-8xCCT1500C Complete set for the fermentation of beer with 8x CCT-1500C, central control cabinetCFSCC2-8xCCT1500C Complete set for the fermentation of beer with 8x CCT-1500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-2xCCT1500C Complete set for the fermentation of beer with 2x CCT-1500C, central control cabinetCFSCC2-2xCCT1500C Complete set for the fermentation of beer with 2x CCT-1500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-4xCCT1500C Complete set for the fermentation of beer with 4x CCT-1500C, central control cabinetCFSCC2-4xCCT1500C Complete set for the fermentation of beer with 4x CCT-1500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-10xCCT1500C Complete set for the fermentation of beer with 10x CCT-1500C, central control cabinetCFSCC2-10xCCT1500C Complete set for the fermentation of beer with 10x CCT-1500C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


 

IV. Complete fermentation sets with double-cooling-zone CC-tanks 2000 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-8xCCT2000C Complete set for the fermentation of beer with 8x CCT-2000C, central control cabinetCFSCC2-8xCCT2000C Complete set for the fermentation of beer with 8x CCT-2000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-10xCCT2000C Complete set for the fermentation of beer with 10x CCT-2000C, central control cabinetCFSCC2-10xCCT2000C Complete set for the fermentation of beer with 10x CCT-2000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-2xCCT2000C Complete set for the fermentation of beer with 2x CCT-2000C, central control cabinetCFSCC2-2xCCT2000C Complete set for the fermentation of beer with 2x CCT-2000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-4xCCT2000C Complete set for the fermentation of beer with 4x CCT-2000C, central control cabinetCFSCC2-4xCCT2000C Complete set for the fermentation of beer with 4x CCT-2000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-6xCCT2000C Complete set for the fermentation of beer with 6x CCT-2000C, central control cabinetCFSCC2-6xCCT2000C Complete set for the fermentation of beer with 6x CCT-2000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


 

V. Complete fermentation sets with double-cooling-zone CC-tanks 3000 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-2xCCT3000C Complete set for the fermentation of beer with 2x CCT-3000C, central control cabinetCFSCC2-2xCCT3000C Complete set for the fermentation of beer with 2x CCT-3000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-6xCCT3000C Complete set for the fermentation of beer with 6x CCT-3000C, central control cabinetCFSCC2-6xCCT3000C Complete set for the fermentation of beer with 6x CCT-3000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-4xCCT3000C Complete set for the fermentation of beer with 4x CCT-3000C, central control cabinetCFSCC2-4xCCT3000C Complete set for the fermentation of beer with 4x CCT-3000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-8xCCT3000C Complete set for the fermentation of beer with 8x CCT-3000C, central control cabinetCFSCC2-8xCCT3000C Complete set for the fermentation of beer with 8x CCT-3000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-10xCCT3000C Complete set for the fermentation of beer with 10x CCT-3000C, central control cabinetCFSCC2-10xCCT3000C Complete set for the fermentation of beer with 10x CCT-3000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


 

VI. Complete fermentation sets with double-cooling-zone CC-tanks 4000 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-2xCCT4000C Complete set for the fermentation of beer with 2x CCT-4000C, central control cabinetCFSCC2-2xCCT4000C Complete set for the fermentation of beer with 2x CCT-4000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-4xCCT4000C Complete set for the fermentation of beer with 4x CCT-4000C, central control cabinetCFSCC2-4xCCT4000C Complete set for the fermentation of beer with 4x CCT-4000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-6xCCT4000C Complete set for the fermentation of beer with 6x CCT-4000C, central control cabinetCFSCC2-6xCCT4000C Complete set for the fermentation of beer with 6x CCT-4000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-8xCCT4000C Complete set for the fermentation of beer with 8x CCT-4000C, central control cabinetCFSCC2-8xCCT4000C Complete set for the fermentation of beer with 8x CCT-4000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-10xCCT4000C Complete set for the fermentation of beer with 10x CCT-4000C, central control cabinetCFSCC2-10xCCT4000C Complete set for the fermentation of beer with 10x CCT-4000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


 

VII. Complete fermentation sets with double-cooling-zone CC-tanks 6000 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-2xCCT6000C Complete set for the fermentation of beer with 2x CCT-6000C, central control cabinetCFSCC2-2xCCT6000C Complete set for the fermentation of beer with 2x CCT-6000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-4xCCT6000C Complete set for the fermentation of beer with 4x CCT-6000C, central control cabinetCFSCC2-4xCCT6000C Complete set for the fermentation of beer with 4x CCT-6000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-6xCCT6000C Complete set for the fermentation of beer with 6x CCT-6000C, central control cabinetCFSCC2-6xCCT6000C Complete set for the fermentation of beer with 6x CCT-6000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-8xCCT6000C Complete set for the fermentation of beer with 8x CCT-6000C, central control cabinetCFSCC2-8xCCT6000C Complete set for the fermentation of beer with 8x CCT-6000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-10xCCT6000C Complete set for the fermentation of beer with 10x CCT-6000C, central control cabinetCFSCC2-10xCCT6000C Complete set for the fermentation of beer with 10x CCT-6000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


 

VIII. Complete fermentation sets with double-cooling-zone CC-tanks 8000 liters, one glycol cooler and central cabinet control system :

  • CFSCC2-2xCCT8000C Complete set for the fermentation of beer with 2x CCT-8000C, central control cabinetCFSCC2-2xCCT8000C Complete set for the fermentation of beer with 2x CCT-8000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-4xCCT8000C Complete set for the fermentation of beer with 4x CCT-8000C, central control cabinetCFSCC2-4xCCT8000C Complete set for the fermentation of beer with 4x CCT-8000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-6xCCT8000C Complete set for the fermentation of beer with 6x CCT-8000C, central control cabinetCFSCC2-6xCCT8000C Complete set for the fermentation of beer with 6x CCT-8000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-8xCCT8000C Complete set for the fermentation of beer with 8x CCT-8000C, central control cabinetCFSCC2-8xCCT8000C Complete set for the fermentation of beer with 8x CCT-8000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
  • CFSCC2-10xCCT8000C Complete set for the fermentation of beer with 10x CCT-8000C, central control cabinetCFSCC2-10xCCT8000C Complete set for the fermentation of beer with 10x CCT-8000C, central control cabinet
    Complete set for the fermentation and maturation of beer. This set  includes all equipment necessary for professional production of beer using the fermentation and maturation of wort produced before by the brewhouse. This set is also designed for production of cider from fruit or carbonized wine. Assembling of the set is very easy. The installation does not require any professional workers - there is needed only adequate handling equipment for moving and installation of heavy cylindrical-conical fermenters on place after delivering of the set.  All wires, temperature measuring and regulation equipment (exclude covered central control cabinet and cooler) operate with safety voltage 24V, therefore… Read more »
WordPress RSS Feed Retriever by Theme Mason

See all configurations

 


Prices of other configurations on demand (other volumes, types or numbers of tanks, cooling more equipment using one chiller etc.)

inquiry-buttonPricelist of the FUIC Fermentation - Maturation units Modulo

 

>> Main page with the Complete fermentation systems<<

keyboard_arrow_up